The 4 quadrants described in the article “Operations
Innovation & Transformation – the 4 Types” positions the lower left
quadrant as a strategy for using a “fleet” of physical assets in a new way.
In this quadrant, a group of similar industrial operations
(2 or more) adapt their performance objectives, business processes and
accompanying hiring and information strategies to optimize the “fleet”. The move is to unifying the industrial enterprise
over multiple sites (in groups or as a whole), with a more holistic view in
terms of operating strategy and performance management.
This innovation can be limited by the distribution
flexibility among the locations, but several corporations have achieved success
with this. One example is keeping most
of the locations operating at a constant or “base” portion of the combined
market demand, and using the more agile locations to deliver the “swing” or
variable portion of the demand. Another
example is allowing all locations to serve their local markets without
contribution from any other of the “fleet”, but they all adapt their operations
to meet a shared performance objective, such as yield or efficiency.
A key method used to sustain this strategy is the increased
automation of work. This is a
significant step beyond scorecards, dashboards or rigid workflows. The following 2 examples show how real-time
performance measures (different from traditional KPI’s) and proactive
procedural automation sustain this differentiation:
·
A “fleet” of similar industrial operations have
some distribution flexibility so that they can deliver a portion of each
other’s market demand. Each operation
delivery point and each operating shift for that segment are benchmarked with
the others, and all delivery points and their shift performance carry a
real-time performance score. Some
delivery points are more agile, and some operator shifts have fewer errors than
others (quality, over/under delivering, reworks).
Coordinators (different industries
have different names for this function) use workflows to negotiate upcoming
changes in demand and the operating shift and the coordinators use the same
visual demand, using a “tram line” display.
Information to the right of the center dashed line is forecast and
planned.
·
A “fleet” of similar industrial operations within
a single location or nearby locations has distribution flexibility, but they only
share in real-time benchmarking (such as efficiency) and online performance
guidance. The following is an example
when all physical assets are used, with equal output at this point in time:
All of the physical assets share
real-time benchmarking performance on efficiency and availability. Now consider what can happen differently when
supply or demand changes suddenly, such as an unplanned outage within the
industrial operation or within a client’s operation:
In the left-hand diagram, losing
capacity can cause all of the “fleet” to shut down, if fast and accurate
guidance isn’t available and used to either import capacity (if feasible) or
negotiate reductions in demand with one or more of the customers.
In the right-hand diagram, a
client’s unplanned outage causes some or all of the “fleet” to operate in zones
which might be unstable and trigger unplanned outages, if fast and accurate
guidance isn’t available and used to either shut down one of the physical
assets or export some of the product (at a discounted price).
Proactive
procedural automation, using real-time performance measures and best practices,
helps the fleet to sustain high reliability and better overall efficiency,
yield etc. It is used to present the
decision makers (including operators) the business and operational alternatives
and their consequences, in a simple form, such as the efficiency/yield/cost
without changes and the corresponding performance if one of the alternatives is
implemented in time to avert an unplanned outage or a significant shortfall in
performance. This doesn’t require exotic
technology, but it requires the implementation of trustworthy, on-line
performance calculations and human workflows.